Image: Swimming Pool
Can't find what you're looking for? Try searching our site

Section Navigation

Services

Installation

Subject to completion of the works outlined in DBC Quotation, The Deeply Boring Company will complete the following works:

  1. Provide fixed priced quotations for geothermal installation, subject to soil conditions being as geological survey report.
  2. Complete deep bore piling, depth to suit ground conditions – likely to be between 50m and 100m depth.
  3. Install flow and return pipework, including ground collectors, within boreholes including insulating grout and sleeves for boreholes if ground conditions dictate.
  4. Complete trench work from geothermal boreholes to plant room, supply/install high specification insulated pipework to agreed position within plant room and re-landscape site.
  5. Fabricate manifold pipework within plant room including flow and return pipework to heat pump.
  6. Supply/install appropriate size of heat pump including variable speed circulation pumps and electronic controls.
  7. Install full control system, to ensure priority to geothermal with occasional back-up heating provided by off-peak electric heating.
  8. Connect geothermal heating into clients’ air handling unit, also pool and spa water heating.
  9. Connect geothermal heating into pressurised cylinder for provision of hot water to shower, basins etc.
  10. Commission all equipment and leave fully operational.